Add to favorite
 
Subscribe to our Newsletters Subscribe to our Newsletters Get Daily Updates RSS
russian visa


Chukotka - Magadan Oblast Energy Bridge
September 8, 2015 17:55


(Source: http://magadanmedia.ru/news/kolyma)

The cost of an energy bridge connecting the isolated energy system of Chukotka with Magadan Oblast has grown more than thrice - up to 138 billion roubles - over half a year. Such estimate was named on Thursday by the Head of the “RAO ES of the East” (an energy holding of Far East being a part of “RusHydro”) Sergei Tolstoguzov at the Eastern Economic Forum (EEF).

The energy bridge means high-voltage lines Bilibino-Kekura-Peschanka-Omsukchan that are needed for the development of the deposits of Baimskaya ore zone in Chukotka. “RAO ES of the East” has signed an agreement with the Chukotka Autonomous Region and “Baimskaya Mining Company” LLC (included in Millhouse of Roman Abramovich) on the modernization of the energy sector in the region within the frame of the forum, as the energy holding reports.

It involves the design and construction of power transmission lines and a power centre with the capacity of 20 MW in Bilibino. The Chukotka government has taken an obligation to prepare design and estimate documentation, “RAO ES of the East” will perform design and survey works and the estimate of the cost of the energy centre. In January 2015 the Fund for the Far East Development (VEB structure), “Baimskaya Mining Company” LLC, “Base Metals” CJSC and the Chukotka government signed an agreement on the intentions on the project of the development of deposits of Baimskaya ore zone. Then the construction of an energy bridge was estimated at 38 billion roubles.

The resource potential of Baimskaya zone is estimated at 27 million tons of copper and 2000 tons of gold. It is also planned to implement another energy project in Chukotka costing 25 billion roubles at the expense of “Rosneftegaz” (see “Kommersant” as of May 5). “RusHydro” agreed on the inclusion of the construction of Bilibinskaya thermal power station in Chukotka in the investment program of “Rosneftegaz”, as the energy company reported in its draft annual report for 2014. The thermal power station should replace the Bilibinskaya Nuclear Power Station of “Rosenergoatom” with a capacity of 48 MW which is to be withdrawn from service in 2019-2020.


Sources: http://lenta.ru 

Author: Anna Dorozhkina

Tags:      

Next Previous

You might also find interesting:

Sberbank Increased Its Net Profit Traditional Russian Sports, Part 1 Will MTS Return to Uzbekistan? London Forum: Visitors Outlook Russia Does Not Regret Its Inability To Participate In G8





comments powered by Disqus




Comment on our site


RSS   twitter   facebook   submit

Bookmark and Share

Russian Parliament in Action

search on the map
TAGS:
Russia  Russian Literature  Medicines  Moscow Ocean Park  Russians abroad  Alzheimer's Disease  Olympic Games 2012  Russian art  modern piracy  Vegetarianism  Nikolai Klyuev  obituary  Alexander Volkov  Russian banks  Colours Festival   Russia international  UTair  Moscow  Painting  Russian regions  Navalny  flight discounts  Woodwork  Mercedes-Benz Fashion Week Russia  protest actions  Russian history  Winzavod  Archeology  Politkosvkaya murder case  St. Petersburg actions  IMAX  Cars  Resources  shaman festival   Russian Cinema  Moscow hotels  LGBT in Russia  Dina Rubina  Russian tourism  Exhibitions in Moscow  Department of Natural Resources and Environmental Protection  Saint Petersburg Museums  Puppet Theatres  History Museum  Krasnodar region  Krasnoyarsk  Russian business  Russian sportsmen  accident  Izmailovo Kremlin 


Travel Blogs
Top Traveling Sites