Add to favorite
 
Subscribe to our Newsletters Subscribe to our Newsletters Get Daily Updates RSS
russian visa


Chukotka - Magadan Oblast Energy Bridge
September 8, 2015 17:55


(Source: http://magadanmedia.ru/news/kolyma)

The cost of an energy bridge connecting the isolated energy system of Chukotka with Magadan Oblast has grown more than thrice - up to 138 billion roubles - over half a year. Such estimate was named on Thursday by the Head of the “RAO ES of the East” (an energy holding of Far East being a part of “RusHydro”) Sergei Tolstoguzov at the Eastern Economic Forum (EEF).

The energy bridge means high-voltage lines Bilibino-Kekura-Peschanka-Omsukchan that are needed for the development of the deposits of Baimskaya ore zone in Chukotka. “RAO ES of the East” has signed an agreement with the Chukotka Autonomous Region and “Baimskaya Mining Company” LLC (included in Millhouse of Roman Abramovich) on the modernization of the energy sector in the region within the frame of the forum, as the energy holding reports.

It involves the design and construction of power transmission lines and a power centre with the capacity of 20 MW in Bilibino. The Chukotka government has taken an obligation to prepare design and estimate documentation, “RAO ES of the East” will perform design and survey works and the estimate of the cost of the energy centre. In January 2015 the Fund for the Far East Development (VEB structure), “Baimskaya Mining Company” LLC, “Base Metals” CJSC and the Chukotka government signed an agreement on the intentions on the project of the development of deposits of Baimskaya ore zone. Then the construction of an energy bridge was estimated at 38 billion roubles.

The resource potential of Baimskaya zone is estimated at 27 million tons of copper and 2000 tons of gold. It is also planned to implement another energy project in Chukotka costing 25 billion roubles at the expense of “Rosneftegaz” (see “Kommersant” as of May 5). “RusHydro” agreed on the inclusion of the construction of Bilibinskaya thermal power station in Chukotka in the investment program of “Rosneftegaz”, as the energy company reported in its draft annual report for 2014. The thermal power station should replace the Bilibinskaya Nuclear Power Station of “Rosenergoatom” with a capacity of 48 MW which is to be withdrawn from service in 2019-2020.


Sources: http://lenta.ru 

Author: Anna Dorozhkina

Tags:      

Next Previous

You might also find interesting:

Freezing Rain In Krasnodar South Stream Gas System Dollars dive against Ruble Monument To the Victims Of Political Repressions Yandex. Taxi Intends to Attract 150-200 Million Dollars





comments powered by Disqus




Comment on our site


RSS   twitter   facebook   submit

Bookmark and Share

Russian Parliament in Action

search on the map
TAGS:
Yandex  Russian universities  Russian Cinema  Kazan  Megafon  Russian Internet providers  science units  Painting  Master-Bank.  Russian International  Moscow hotels  Bridges  Modern Art  Vologda  luxury travel in Russia  Sergei Obraztsov  New Films  Dmitry Shostakovich  Exhibitions in Moscow  Alexander Sokurov  work in Russia  Volgograd  Dmitry Kravchenko expedition  Ultralight Trike Show  the Bolshoi Theatre  Russian Literature  Russian history  world record  Russian opposition activists  Mercedes-Benz Fashion Week Russia  Russian business  invest  Russian rouble  Photography  Russian economy  Dermatology  Russian tourism  beauty contest  Ferapont Monastery  Yury Yakovenko  Archeology  Izhevsk  Museum of Cinema  Festival Music is the Time of Genius   Russian regions  Olga Borodina  Moscow  Football  Sergey Volkov  Mud Treatment 


Travel Blogs
Top Traveling Sites